24.8 Migration Schedule

The migration schedule enables you to specify whether to start the first replication manually or on a specific date and a specific time.

24.8.1 Migration Schedule Using Migrate Client

To schedule the migration start date and time:

  1. In the Jobs view, locate the required job.

  2. In the Job Configuration section of the Migration Job window, click Schedule.

  3. Select Run at a later time, then specify the date and start time for the first replication.

  4. Click OK.

24.8.2 Migration Schedule Using Migrate Web Interface

To schedule the migration start date and time:

  1. On the Edit Migration Details page, go to Schedule Settings > Full Replication, then click Edit.

  2. Click Start, then set the date and time when you want to start the first full replication.

    You can type the date (dd/mm/yyyy) or click the Calendar icon to select the date. The default run time is 12:00:00 a.m. (hh:mm:ss a.m. or p.m.).

  3. Click Close to return to the Edit Migration Details page.

  4. Click Save.