Type a number that represents the number of times you want DGS to attempt to reconnect to WebSphere MQ before abandoning reconnection attempts.
If the number of retry attempts is achieved without successful reconnection, the Distributed Generation Server changes automatically to an AppMaster Builder Batch Server.
If this field is blank, no reconnection attempts are made.
If you specify 0 (zero), reconnection attempts continue indefinitely at the specified interval until reconnection is accomplished or you manually shut down the DGS.