Closing Verified Change Requests

  1. Open the Change Request view.
  2. Click Link with Selection in the Change Request view toolbar.
  3. Select the folder containing the change request in the Server Explorer or in one of the Eclipse Explorers.
  4. Double-click the change request. The Change Request <number, revision #> dialog box opens.
  5. Change the status to Closed. StarTeam has the following closed statuses:
    • Closed (As Designed)
    • Closed (Cannot Reproduce)
    • Closed (Deferred)
    • Closed (Documented)
    • Closed (Fixed)
    • Closed (Is Duplicate)
  6. Do one of the following:
    • Click Apply, then click the Next or Previous button to close another change request.
    • Click OK.