Attaching an Existing View or Revision Label to a Specific Item Revision

  1. Select a folder from the folder tree.
  2. Click the component tab containing the items you want to label.
  3. Right-click an item revision in the Label pane and choose Attach.

    The Attach a Label dialog box opens. This dialog box lists all existing labels and identifies them as view or revision labels. By default, both the View Labels and Revision Labels options are checked.

  4. Uncheck View Labels or Revision Labels to limit the list to one specific type of label.
  5. Select a label from the list.
  6. Indicate what item revision is to receive this label by selecting a configuration option. The choices are:
    Current Configuration
    Attaches the label to the tip revision.
    Labeled Configuration
    Attaches the label to the revision with a specified label. The labels are in reverse chronological order based on the time at which they were created.
    Promotion State Configuration
    Attaches the label to the revision currently in a specified promotion state. (Actually, the label is attached to the revision that has the promotion state's current view label.)
    Configuration As Of
    Attach the label to the revision that was the tip revision at a specified date and time.
  7. Click OK.