Before uploading a
Silk Performer project to
Silk Central, ensure that you have properly configured the project's workload through
Silk Performer. Workload settings are subsequently specified along with uploaded projects in the
Silk Performer
Test Properties portion of the
Properties page in
Silk Central’s
Tests unit.
-
In
Silk Performer, open the project that you want to upload and choose
.
If the project has previously been uploaded to
Silk Central, the association with a
Silk Central test is already known and preselected. Click
Next and go to step 3.
-
From the
Projects list, select the
Silk Central project to which you want to upload the
Silk Performer project and click
Next.
You can select an existing test to replace or you can create a new test by right-clicking the appropriate folder or container
choosing
New Child Test.
You can also create a new folder within an existing test container by right-clicking a container and choosing
New Child Test Folder.
Note: Newly created tests and folders are displayed with bold text to indicate that they have not yet been written to the
Silk Central database. If you click
Cancel, the items you have created are not saved.
-
Check the
Enable Results Upload check box to select specific test run results to upload with the project and then click
Next.
If you do not want to upload test run results at this time, do not check the
Enable Results Upload check box. Instead, click
Finish.
-
On the
Select results page, check the appropriate check boxes in the
Results list to select the results that you want to upload along with the project and then click
Next.
-
Specify version and build numbers for the assigned product to which the uploaded results belong.
-
Click
Finish to upload the project to
Silk Central.
The newly uploaded items appear in
Silk Central's test and
Project menu tree.