The Assigned Requirements page lists the requirements that have been assigned to the selected test or project, and allows you to assign additional requirements. The Available Requirements tree lists all requirements that can be assigned.
For each assigned requirement, the page displays the following columns:
Column | Description |
---|---|
Actions | Actions that you can perform on the selected requirement. Remove Requirement, Locate, and View Description. |
Requirement | Name of the assigned requirement. Click to open the | page.
Priority | Priority of the requirement. |
Risk | Potential risk associated with the requirement. |
Reviewed | Review status of the requirement. |