Run the following instructions from an Enterprise Server command prompt (Windows), or shell prompt (UNIX).
$set sourceformat(variable) program-id. "demo2". working-storage section. >>JAVA-SHAREABLE ON 01 grp1. 03 i1 pic 9(8) comp-5 value 88888888. 03 i2 pic 9(8) comp-5 value 12345678. >>JAVA-SHAREABLE OFF 01 grp2. 03 p1 pic x. 03 p2 pic 9. procedure division. display "start". display "value of shared CBL grp is: " display grp1::i1. display grp1::i2. end program.
Windows:
cobol demo2.cbl java-package-name(com.mycompany.demo2) java-output-path(src2) java-gen-strg ibmcomp;
UNIX:
cob -yo libdemo2.so -C "java-package-name(com.mycompany.demo2) java-output-path(src2) java-gen-strg java-gen-progs ibmcomp" -Q -znoexecstack demo2.cbl
The COBOL library file (UNIX only) is generated, and its supporting class files are generated using the com.mycompany.demo2 package name and placed in the src2 folder.
cbllink -D demo2.obj
The COBOL library file is generated.
import com.mycompany.demo2.*; public class Demo2 { public static void main(String[] args) { System.out.println("--COBOL items now accessible in Java--"); int i1 = strg.demo2.grp1.i1.get(); int i2 = strg.demo2.grp1.i2.get(); System.out.println("-- COBOL item i1 = " + i1); System.out.println("-- COBOL item i2 = " + i2); strg.demo2.grp1.i1.put(77777777); System.out.println("-- i1 updated from Java = " + strg.demo2.grp1.i1.get()); } }The Java code imports the namespace that the COBOL compilation used. You should also ensure that the current working folder and the src2 folder are on the CLASSPATH.
javac Demo2.java java Demo2
The following output is produced:
--COBOL items now accessible in Java-- -- COBOL item i1 = 88888888 -- COBOL item i2 = 12345678 -- i1 updated from Java = 77777777
The code and the output shows that the COBOL program has shared two PIC 9 COMP-5 items with the Java program. The Java program has used the get method to view the value of the COBOL data (to do this, the COMP-5 item was mapped to int types, as per Mapping COBOL Items and Java Types). The Java program then used the put method to change the value of the COBOL item (where again the mapping process was used, under the covers).