Scheduling Report Archiving by Resource Group
Where: Navigator > Resources > Reports
-
Right-click the report group and select Schedule for archiving>Report group.
-
On the Jobs tab, click Add.
-
Enter a name and description for the job.
-
In the Job Parameters section, select or enter values for the parameter fields as necessary.
-
In the Jobs scheduler, click the link labeled Click here to set up schedule frequency.
-
In the Job Scheduler dialog, select the desired frequency and enter the associated settings:
Option
Description
Schedule Frequency
Choose a timing for the schedule. The typical choices are self-explanatory: Hourly, Daily, Weekly, Monthly, and Yearly. For each timing, enter additional settings such as occurrence (Every) and time. For Monthly, also specify the day of the month. For Yearly, specify the month and date.
Caution: If you are scheduling a yearly report on a leap year and you choose February 29 as the month and date, the Console will not save your setting. To ensure that yearly reports are covered on leap years, choose a different date; or choose either February 28 or March 1 if you want your schedule to be as close as possible to February 29.
Schedule Range
Select the start and end date for the report run.
-
Click OK.
-
Repeat as required to add another schedule for the same group.