Scheduling Report Archiving by Resource Group

Where: Navigator > Resources > Reports

  1. Right-click the report group and select Schedule for archiving>Report group.

  2. On the Jobs tab, click Add.

  3. Enter a name and description for the job.

  4. In the Job Parameters section, select or enter values for the parameter fields as necessary.

  5. In the Jobs scheduler, click the link labeled Click here to set up schedule frequency.

  6. Click OK.

  7. Repeat as required to add another schedule for the same group.